[Q48-Q69] Get 100% Passing Success With True DES-6322 Exam! [Nov-2021]

Share

Get 100% Passing Success With True DES-6322 Exam! [Nov-2021] 

EMC DES-6322 PDF Questions - Exceptional Practice To Specialist - Implementation Engineer, VxRail Exam


EMC DES-6322 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe how to Implement licenses for a VxRail cluster
  • VxRail Cluster Expansion and Stretched Clusters
Topic 2
  • Perform VxRail RASR factory image upgrade and reset procedures
  • Describe VxRail management, licensing, and data protection options
Topic 3
  • Describe VxRail troubleshooting resources and their uses
  • VxRail Network Environment Requirements and Initialization
Topic 4
  • Describe considerations for deploying Embedded and External vCenter
  • VxRail Pre-deployment Tasks and Hardware Installation
Topic 5
  • Perform post-installation validation of the VxRail Cluster Configure
  • Describe VxRail pre-installation requirements and use of the configuration tools
Topic 6
  • Describe VxRail system racking and cabling procedures
  • Describe VxRail Upgrade requirements and activities
Topic 7
  • Describe the VxRail Stretched Cluster architecture, features, and requirements
  • Describe system power up/down and setting management VLAN procedures
Topic 8
  • Identify REST API functionality available in VxRail and use VxRail API
  • Describe VxRail use cases, architecture, models, and software stack
Topic 9
  • Describe VxRail appliance scale-out best practices and the cluster expansion process
  • Perform a VxRail initialization using the VxRail First Run Wizard
Topic 10
  • Explain differences in the VxRail implementation procedures for various
  • Complete a Test Plan and generate a VxRail As-Built Configuration report
Topic 11
  • Explain the vSAN configuration settings and configure required vSAN settings post deployment
  • Validate the network environment using the Network Validation Tool

 

NEW QUESTION 48
What is validated by running the Proactive Network Performance test in vCenter on a VxRail cluster?

  • A. Latency measurement between DCs for Stretched Clusters
  • B. Latency and bandwidth measurement to the witness host
  • C. Network configuration and performance for vSAN
  • D. Network performance for virtual machines

Answer: B

 

NEW QUESTION 49
A VxRail API request has been executed and the user account does not have vCenter privileges to perform the task What code is returned?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

 

NEW QUESTION 50
A VxRail E560F model was delivered six months ago and is now scheduled to be installed with the target code. What is the correct order of steps to complete this task?

Answer:

Explanation:

 

NEW QUESTION 51
An implementation engineer needs to validate the VxRail network configuration. Where can they obtain the NVT for VxRail?

  • A. Dell Technologies Central
  • B. Dell VxRail Fast Pass
  • C. Dell Technologies Information Hub
  • D. Dell VxRail Expert Channel

Answer: A

 

NEW QUESTION 52
From what environment must a network administrator run VxRail network validation?

  • A. Windows PowerShell command prompt
  • B. VxRail Deployment Wizard
  • C. Top of Rack switches
  • D. Same subnet as VxRail Management Network

Answer: C

 

NEW QUESTION 53
Match each component of the VxRail HCI System Software to its description.

Answer:

Explanation:

 

NEW QUESTION 54
In a VxRail Stretched Cluster deployment of 8 nodes on between sites?

  • A. Primary to Witness site RTT: < 200 ms Secondary to Witness site RTT: < 200 ms Primary to Secondary site RTT: <: 5 ms
  • B. Primary to Witness site RTT: < 200 ms Secondary to Witness site RTT < 200 ms Primary to Secondary site RTT: < 10 ms
  • C. Primary to Witness site RTT: < 250 ms Secondary to Witness site RTT; < 250 ms Primary to Secondary site RTT: < 5 ms
  • D. Primary to Witness site RTT: < 150 ms Secondary to Witness site RTT: < 150 ms Primary to Secondary site RTT: < 10 ms

Answer: D

 

NEW QUESTION 55
What is a benefit of using the VxRail REST API?

  • A. Programmatically gather VxRail system health
  • B. Remote upgrades of iDRAC related software only
  • C. Automated security audits of VxRail clusters
  • D. Polling for vSAN performance statistics

Answer: A

 

NEW QUESTION 56
A VxRail Manager VM must be configured as follows:
* IP address: 192 168.10.16
* Net mask: 255.255.255.0
* Gateway: 192 168 10 254
Which command must be used?

  • A. vxrail-network -config --vxrail-address 192.166 10 16 --vxrail-netmask 255 255.255 0 --vxrail-gateway 192.168.10.254
  • B. vxrail-prrmary -config --ip 192 168 10 16 -netmask 255 255 255 0 -gateway 192 168 10 254
  • C. vxrail-primary -config --vxrail-address 192.168.10 16 --vxrail-netmask 255 255 255 0 -vxrail-gateway 192.168,10 254
  • D. vxrail-network-config --ip 192 168 10.16-netmask 255.255.255.0-gateway 192 168 10.254

Answer: C

 

NEW QUESTION 57
How should an administrator manually validate the DNS readiness of a customer network?

  • A. Generate a Network PEQ
  • B. Run nslookup on server FQDN and IP
  • C. Ping the default gateway of the management VLAN
  • D. Run a traceroute to the DNS server

Answer: D

 

NEW QUESTION 58
What is the minimum number of VxRail nodes required for a vSAN storage policy with RAID-6 (Erasure Coding)?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 59
A 2-node VxRail duster Is being deployed. Due to a preparation mistake, the host section fe missing. Use the VxRail simulator to fully deploy the cluster using the JSON file.
Node Names:
vcluster-esxO 15-vrack
vcluster-esxO 16-vrack
Starting IP
Address: 192.168.10.15
Rack Name: Virtual Rack
Rack Position: 15-16
Passwords: Passwordl23
!
ESXI Management
User: esxmgmt
When you have finished, continue to the next question.




  • A. Send your suggestions for this question.

Answer: A

 

NEW QUESTION 60
What is a consideration when adding nodes to a VxRail G Series chassis?

  • A. G560 and G410 nodes are permitted in the same chassis
  • B. In a full G Series chassis, all nodes must have 10GbE ports
  • C. All nodes in a G Series chassis must be identical
  • D. Hybrid and All-Flash nodes are permitted, if in different chassis

Answer: C

 

NEW QUESTION 61
From what location should NVT for VxRail be run?

  • A. Laptop connected to the first VxRail ESXi node
  • B. VxRail network Top of Rack switch
  • C. Workstation on the same network as VxRail Manager
  • D. Jump server on a different network

Answer: C

 

NEW QUESTION 62
A VxRail Cluster has just been deployed. Use the VxRail simulator to determine the Service Tag, Model, and ESXJ IP Address of the first node - vcluster730.esx01.edu.local.
Note: It is necessary to dose (x) the simulator window before you can select a response to this question.






  • A. Option D
  • B. Option B
  • C. Option A
  • D. Option C

Answer: A

 

NEW QUESTION 63
What is a consideration when expanding a VxRail cluster? (Choose two.)

  • A. 1 GbE must be hybrid and single processor node type
  • B. G Series clusters can be expanded only with G Series nodes
  • C. Expanding a cluster to 64 nodes requires a 25 GbE network
  • D. Mixing of All-Flash and all-NVMe nodes in a cluster is not allowed

Answer: B,C

 

NEW QUESTION 64
An implementation engineer places a VxRail node into maintenance mode using the Ensure accessibility setting What is the engineer likely planning to do?

  • A. Extensive maintenance
  • B. Temporary maintenance
  • C. Permanent removal of host from cluster
  • D. Shutdown of an entire cluster

Answer: A

 

NEW QUESTION 65
Match each component of the VxRail HCI System Software to its description.

Answer:

Explanation:

 

NEW QUESTION 66
Which VxRail model can only be installed with static rack rails?

  • A. P Series
  • B. G Series
  • C. S Series
  • D. D Series

Answer: D

 

NEW QUESTION 67
What are the requirements for a customer-supplied VDS in a VxRail deployment?

  • A. 2 or 4 uplinks
    Port groups for Discovery, Management vCenter Server, vMotion, and vSAN
  • B. 4 or 8 uplinks
    Port groups for Discovery, Management, vMotion, and vSAN only
  • C. 2 or 4 uplinks
    Port groups for Discovery, Management, vMotion, and vSAN only
  • D. 4 or 8 uplinks
    Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN

Answer: B

 

NEW QUESTION 68
An implementation engineer is deploying a new VxRail cluster What should they confirm before installing the hardware?

  • A. At least 24 in (61 cm) of clearance exists in front of and behind the cabinet
  • B. Service laptop is on the same IP network as the iDRACs
  • C. Redundant power zones exist with adequate power cables
  • D. Power distribution supports only the power rating of a single node

Answer: D

 

NEW QUESTION 69
......


Dell EMC VxRail Specialist Exam Certification Details:

Duration90 mins
Sample QuestionsDell EMC VxRail Specialist Sample Questions
Number of Questions60
Passing Score63%
Exam Price$200 (USD)
Schedule ExamPearson VUE
Exam CodeDES-6322
Exam NameDell EMC Certified Specialist - Implementation Engineer - VxRail (DCS-IE)
Books / TrainingVxRail Appliance 7.0.XXX Concepts - ES101CPX02007 - On Demand
VxRail 7.0.XXX Feature - REST API - ES102CPX02009 - On Demand
VxRail Installation and Implementation - ES524CPX00074 - Classroom/Virtual Classroom
VxRail 7.0.XXX Installation and Implementation - ES502CPX02031 - On Demand

 

DES-6322 dumps - TestInsides - 100% Passing Guarantee: https://www.testinsides.top/DES-6322-dumps-review.html