Pass API API-570 exam questions - convert Test Engine to PDF [Q87-Q110]

Share

Pass API API-570 exam questions - convert Test Engine to PDF

Pass Your API-570 Exam Easily - Real API-570 Practice Dump Updated Feb 25, 2024


API-570 exam covers a range of topics related to piping inspection, including codes and standards, corrosion, welding, non-destructive testing, and repairs and alterations. API-570 exam is designed to test both the theoretical knowledge and practical skills of the candidate. API-570 exam consists of 100 multiple-choice questions and is administered over a four-hour period. Candidates must achieve a score of 70% or higher to pass the exam.

 

NEW QUESTION # 87
Where should the numbers be placed on a radiograph?

  • A. On the material being radiographed
  • B. On the film source pack
  • C. Under the film
  • D. Under the material being radiographed

Answer: A


NEW QUESTION # 88
provides general requirements and detailed assessment procedures for specific types of degradation that are referenced in API 570.

  • A. ASME 816.5
  • B. API 653
  • C. API RP 579
  • D. API 598

Answer: C


NEW QUESTION # 89
What is the required thickness of straight run pipe subject to internal pressure only, based on the following conditions: NPS 14, SA 285 Gr.C, EFW Spiral seam (No radiography), operating at 216 psi / 378?F

  • A. Not enough information given
  • B. 0.11"
  • C. 0.06"
  • D. 1.1"

Answer: B


NEW QUESTION # 90
Exemptions for preheating and post weld heat treatment must be approved by the____.

  • A. piping engineer
  • B. applicable standard, API 570
  • C. inspector
  • D. repair procedure.

Answer: A


NEW QUESTION # 91
Is the thickness range on the WPS supported by the PQR?

  • A. Yes
  • B. No
  • C. Re qualification is required by API 570
  • D. Re qualification is required by ASME Section V

Answer: B


NEW QUESTION # 92
Which of the following best describes API 574?

  • A. Standard
  • B. Recommended practice
  • C. code
  • D. specification

Answer: B


NEW QUESTION # 93
Buried piping inspected periodically by excavation shall be inspected in lengths of:

  • A. Any length as long as It IS Inspected full circumference.
  • B. 3 feet -5. feet
  • C. Any length as long as it is inspected 180° circumference.
  • D. 6 feet -8 feet.

Answer: D


NEW QUESTION # 94
The acronym CUI refers to.

  • A. Cold Under-ground In-service piping
  • B. Carpet Under Infra-structure
  • C. Corrosion Under Insulation
  • D. Corrosion Under Inside flow

Answer: C


NEW QUESTION # 95
The letter "B" is placed on radiographic film holder for what reason?

  • A. To function as a location marker for the radiograph
  • B. To designate whether the penetrameter is on the film side or the back side
  • C. To determine if back scatter radiation is exposing the film
  • D. To show the distance from the source of radiation to the weld

Answer: C


NEW QUESTION # 96
In lieu of the required heat treatment after welding, what may be used as an alternative?

  • A. Air Hardening
  • B. Quenching
  • C. Normalizing/annealing
  • D. Strain Harmonics

Answer: C


NEW QUESTION # 97
Each piece of magnetizing equipment shall be calibrated

  • A. at least once a year or whenever the equipment has been subject to major electrical repair
  • B. at least once every 90 days
  • C. whenever the technician feels like it
  • D. at the beginning of each shift

Answer: A


NEW QUESTION # 98
To evaluate the effects of fire damage, an assessment should be performed in accordance with____.

  • A. API 598, Section 1
  • B. API RP 2207 Section 2
  • C. ASME 816.5
  • D. API RP 579, Section 11

Answer: D


NEW QUESTION # 99
What should have been the correct number and type of guide bends on the PQR?

  • A. 2 face and 2 root bends
  • B. No side bends required
  • C. 1 side, 1 face and 1 root bend
  • D. 6 side bends

Answer: B


NEW QUESTION # 100
When a welder has not welded with a process during a period of, his qualifications for that process shall expire

  • A. 12 months or more
  • B. 9 months or more
  • C. 3 months or more
  • D. 6 months or more

Answer: D


NEW QUESTION # 101
The outside diameter of piping in high-temperature service, about 800°F, should be measured to check for

  • A. swelling
  • B. creep
  • C. internal product build-up
  • D. diameter enlargement

Answer: B


NEW QUESTION # 102
The transmitted film density through the radiographic image of the body of the appropriate hole penetrameter and the area of interest shall be minimum for radiographs made with a gamma ray source.

  • A. 1.8
  • B. 2.0
  • C. 2.6
  • D. 2.2

Answer: B


NEW QUESTION # 103
What is the acceptable method to temporarily repair a longitudinal crack in an existing piping system?

  • A. Installing a full encirclement welded split sleeve
  • B. Welding a box over the cracked area
  • C. Using a full encirclement welded spilt sleeve, with the approval of the piping engineer
  • D. Welding over the crack

Answer: C


NEW QUESTION # 104
all suspect areas and areas of damaged insulation should be examined?

  • A. 100%
  • B. 50%
  • C. 33%
  • D. 10%

Answer: D


NEW QUESTION # 105
The repair organization shall use welders and welding operators qualified in accordance with the code to which the piping was built or alternatively_____.

  • A. ASME B 31.3
  • B. ASME Section V
  • C. AWS D 1.1
  • D. API 1104

Answer: A


NEW QUESTION # 106
Impact testing of each form of material for any specification shall be done using procedures and apparatus in accordance with

  • A. ASTM A 370
  • B. ASME Section V
  • C. API 570
  • D. AWS D 1.5

Answer: A


NEW QUESTION # 107
When an injection point circuit for the purpose of inspection is designated, the recommended up stream limit of the injection point circuit shall be the greater of ?

  • A. three pipe diameters
  • B. both A and C
  • C. minimum 12 inches
  • D. maximum 12 inches

Answer: B


NEW QUESTION # 108
The inspector shall approve all repair and alteration work at designated times, referred to as_______.

  • A. work stop points
  • B. inspection delay points
  • C. inspector's discretion
  • D. hold points

Answer: D


NEW QUESTION # 109
Radiographic profile techniques are preferred over ultrasonic thickness measuring instruments for pipe diameters of:

  • A. NPS 2 and over
  • B. NPS 1 'and over
  • C. NPS 2 and under
  • D. NPS 1 and under

Answer: D


NEW QUESTION # 110
......

API-570 Real Exam Questions and Answers FREE: https://www.testinsides.top/API-570-dumps-review.html