Pass API API-570 exam questions - convert Test Engine to PDF
Pass Your API-570 Exam Easily - Real API-570 Practice Dump Updated Feb 25, 2024
API-570 exam covers a range of topics related to piping inspection, including codes and standards, corrosion, welding, non-destructive testing, and repairs and alterations. API-570 exam is designed to test both the theoretical knowledge and practical skills of the candidate. API-570 exam consists of 100 multiple-choice questions and is administered over a four-hour period. Candidates must achieve a score of 70% or higher to pass the exam.
NEW QUESTION # 87
Where should the numbers be placed on a radiograph?
- A. On the material being radiographed
- B. On the film source pack
- C. Under the film
- D. Under the material being radiographed
Answer: A
NEW QUESTION # 88
provides general requirements and detailed assessment procedures for specific types of degradation that are referenced in API 570.
- A. ASME 816.5
- B. API 653
- C. API RP 579
- D. API 598
Answer: C
NEW QUESTION # 89
What is the required thickness of straight run pipe subject to internal pressure only, based on the following conditions: NPS 14, SA 285 Gr.C, EFW Spiral seam (No radiography), operating at 216 psi / 378?F
- A. Not enough information given
- B. 0.11"
- C. 0.06"
- D. 1.1"
Answer: B
NEW QUESTION # 90
Exemptions for preheating and post weld heat treatment must be approved by the____.
- A. piping engineer
- B. applicable standard, API 570
- C. inspector
- D. repair procedure.
Answer: A
NEW QUESTION # 91
Is the thickness range on the WPS supported by the PQR?
- A. Yes
- B. No
- C. Re qualification is required by API 570
- D. Re qualification is required by ASME Section V
Answer: B
NEW QUESTION # 92
Which of the following best describes API 574?
- A. Standard
- B. Recommended practice
- C. code
- D. specification
Answer: B
NEW QUESTION # 93
Buried piping inspected periodically by excavation shall be inspected in lengths of:
- A. Any length as long as It IS Inspected full circumference.
- B. 3 feet -5. feet
- C. Any length as long as it is inspected 180° circumference.
- D. 6 feet -8 feet.
Answer: D
NEW QUESTION # 94
The acronym CUI refers to.
- A. Cold Under-ground In-service piping
- B. Carpet Under Infra-structure
- C. Corrosion Under Insulation
- D. Corrosion Under Inside flow
Answer: C
NEW QUESTION # 95
The letter "B" is placed on radiographic film holder for what reason?
- A. To function as a location marker for the radiograph
- B. To designate whether the penetrameter is on the film side or the back side
- C. To determine if back scatter radiation is exposing the film
- D. To show the distance from the source of radiation to the weld
Answer: C
NEW QUESTION # 96
In lieu of the required heat treatment after welding, what may be used as an alternative?
- A. Air Hardening
- B. Quenching
- C. Normalizing/annealing
- D. Strain Harmonics
Answer: C
NEW QUESTION # 97
Each piece of magnetizing equipment shall be calibrated
- A. at least once a year or whenever the equipment has been subject to major electrical repair
- B. at least once every 90 days
- C. whenever the technician feels like it
- D. at the beginning of each shift
Answer: A
NEW QUESTION # 98
To evaluate the effects of fire damage, an assessment should be performed in accordance with____.
- A. API 598, Section 1
- B. API RP 2207 Section 2
- C. ASME 816.5
- D. API RP 579, Section 11
Answer: D
NEW QUESTION # 99
What should have been the correct number and type of guide bends on the PQR?
- A. 2 face and 2 root bends
- B. No side bends required
- C. 1 side, 1 face and 1 root bend
- D. 6 side bends
Answer: B
NEW QUESTION # 100
When a welder has not welded with a process during a period of, his qualifications for that process shall expire
- A. 12 months or more
- B. 9 months or more
- C. 3 months or more
- D. 6 months or more
Answer: D
NEW QUESTION # 101
The outside diameter of piping in high-temperature service, about 800°F, should be measured to check for
- A. swelling
- B. creep
- C. internal product build-up
- D. diameter enlargement
Answer: B
NEW QUESTION # 102
The transmitted film density through the radiographic image of the body of the appropriate hole penetrameter and the area of interest shall be minimum for radiographs made with a gamma ray source.
- A. 1.8
- B. 2.0
- C. 2.6
- D. 2.2
Answer: B
NEW QUESTION # 103
What is the acceptable method to temporarily repair a longitudinal crack in an existing piping system?
- A. Installing a full encirclement welded split sleeve
- B. Welding a box over the cracked area
- C. Using a full encirclement welded spilt sleeve, with the approval of the piping engineer
- D. Welding over the crack
Answer: C
NEW QUESTION # 104
all suspect areas and areas of damaged insulation should be examined?
- A. 100%
- B. 50%
- C. 33%
- D. 10%
Answer: D
NEW QUESTION # 105
The repair organization shall use welders and welding operators qualified in accordance with the code to which the piping was built or alternatively_____.
- A. ASME B 31.3
- B. ASME Section V
- C. AWS D 1.1
- D. API 1104
Answer: A
NEW QUESTION # 106
Impact testing of each form of material for any specification shall be done using procedures and apparatus in accordance with
- A. ASTM A 370
- B. ASME Section V
- C. API 570
- D. AWS D 1.5
Answer: A
NEW QUESTION # 107
When an injection point circuit for the purpose of inspection is designated, the recommended up stream limit of the injection point circuit shall be the greater of ?
- A. three pipe diameters
- B. both A and C
- C. minimum 12 inches
- D. maximum 12 inches
Answer: B
NEW QUESTION # 108
The inspector shall approve all repair and alteration work at designated times, referred to as_______.
- A. work stop points
- B. inspection delay points
- C. inspector's discretion
- D. hold points
Answer: D
NEW QUESTION # 109
Radiographic profile techniques are preferred over ultrasonic thickness measuring instruments for pipe diameters of:
- A. NPS 2 and over
- B. NPS 1 'and over
- C. NPS 2 and under
- D. NPS 1 and under
Answer: D
NEW QUESTION # 110
......
API-570 Real Exam Questions and Answers FREE: https://www.testinsides.top/API-570-dumps-review.html