NEW QUESTION 13
Which four notification templates are predefined?
- A. New Account Template
- B. Forgot Username Template
- C. Password Reset Template
- D. Forgot Password Template
- E. New Account Manager Template
Answer: A,B,C,E
Explanation:
Explanation
https://docs.oracle.com/en/cloud/saas/sales/18c/oscus/setting-up-applications-security.html#OSCUS2287154 Predefined Notification Templates Notification Template Description Password Expiry Warning Template Warns the user that a password is expiring soon and provides instructions for resetting the password.
Password Expiration Template
Notifies the user that a password has expired and provides instructions for resetting the password.
Forgot User Name Template
Sends the user name to a user who requested the reminder.
Password Generated Template
Notifies the user that a password has been generated automatically and provides instructions for resetting the password.
Password Reset Template
Sends a reset-password link to a user who requested a new password.
Users can request new passwords by selecting the link on the application Sign In page, or by selecting the Password option on the Preferences page (Settings and Actions > Set Preferences).
Password Reset Confirmation Template
Notifies the user when a password has been reset.
New Account Template
Notifies a user when a user account is created and provides a reset-password link.
New Account Manager Template
Notifies the user's manager when a user account is created.
When you create a user category, it s associated automatically with the predefined notification templates, which are all enabled.
You can't edit the predefined templates. However, you can create templates and disable the predefined versions. Each predefined event can be associated with only one enabled notification template at a time.
NEW QUESTION 14
While opening an organization tree on the Manage Organization Trees page, you notice that the hierarchy status is displayed as Inactive. Identify the two reasons for the organization tree to be in Inactive status. ( Choose two.)
- A. You used Create Tree Version in the action menu.
- B. You used View Tree Version in the action menu.
- C. You opened the hierarchy by clicking the name.
- D. You selected the Edit icon for opening the hierarchy.
- E. You used Create Tree in the action menu.
Answer: D,E
NEW QUESTION 15
When implementing Project Performance Reporting, your customer has the following requirements:
* Every time a project cost is greater than or equal to a threshold, then the project should be shown as critical.
* As long as a project cost is less than the threshold, the project should be shown as on-track.
Which threshold level rule is ideal for this kind of KPI definition? (Choose the best answer.)
- A. multiple threshold levels
- B. multiple threshold level value
- C. single threshold level range
- D. single threshold level value
Answer: D
Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjs/update-project-performance-data- Performance Status Indicator Performance status indicators give an immediate picture of the status of a project, such as critical, at risk, and on track. Each distinct icon indicates the status and severity of performance. During KPI definition, you first associate status indicators with performance statuses:
* Critical
* Severe
* At risk
* On track
* Ahead
You then associate these statuses with threshold levels. When KPI values are generated for a project, each value is compared to the defined thresholds and the corresponding status indicator for the KPI appears on project performance reports.
A status can identify negative performance so that you can take the appropriate actions to prevent or quickly resolve problems. Conversely, a status can identify positive performance to help you track expected or excellent performance.
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/fapfm/implementing-project-financial-m Create Key Performance Indicators Create key performance indicators (KPI) to measure how well your organization performs an operational, tactical, or strategic activity that is critical for the current and future success of the organization.
Note: To create KPIs you must enable a project unit to track key performance indicators.
Use the Threshold Levels section to specify thresholds to indicate the health status of a KPI. Select one of the following options:
* Multiple threshold levels
* Single threshold level value
* Single threshold level range
NEW QUESTION 16
Your customer wants to perform billing based on the Percent Spent invoice method. Identify two setups that are required in project contracts for calculating invoice amounts as per their requirement. (Choose two.)
- A. billing controls
- B. invoice method
- C. billing events
- D. expenditure items
- E. bill plan
Answer: A,E
Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjb/create-customer-contract.html#O Bill Plan - Create a bill plan within a contract that uses the invoice method you require. Assign the bill plan to one or more contract lines. A set of instructions on a contract that define how to invoice a customer. Multiple contract lines on a contract can use the same or different bill plans. Invoice Method is used in creating Bill Plan - not a separate setup.
Billing Controls - Contract feature that controls the types of transactions, dates, and amounts a customer may be invoiced for and revenue can be recognized for a contract or contract line. Define billing controls at the contract or contract line level.
Topic - Creating a Contract for Percent Spent Invoice and Revenue Methods: Worked Example This example describes a scenario where transactions for a contract line need to be invoiced and the revenue recognized using the percent spent method.
What are the revenue and invoice method classifications?Percent Spent
What is the billing extension calculation level for the contract line and project association?Project level Summary of the Tasks Create a contract, create the percent spent contract lines, create the bill plan, create the revenue plan.
Prerequisites
* Create a project.
* Create the project plan for percent spent revenue. Specify the plan type on the percent spent billing extension.
* Create an approved cost budget.
* Create cost and burden rates.
* Enter labor and expense transactions for the project.
* Collect costs for the transactions.
Configuration Steps
* Creating the Contract
* Creating the Percent Spent Contract Lines
* Creating the Bill Plan - A set of instructions on a contract that define how to invoice a customer.
Multiple contract lines on a contract can use the same or different bill plans.
* Creating the Revenue Plan - Common set of instructions for recognizing revenue within a contract.
Multiple contract lines on a contract can use the same or different revenue plans.
Invoice method classifications determine how transactions are invoiced. The invoice method determines how invoice amounts are derived.
* Enter an invoice method on a bill plan, which you create for a contract and assign to contract lines to provide a set of instructions for creating an invoice.
* Create billing controls for a contract or contract line to define the valid transaction dates, billing resources, and amount limits for transactions associated with the contract.
* Generate invoices to calculate the invoice amounts for a contract.
The following figure illustrates the components of a project and a contract that determine invoice amounts, and the relationships between the components.
Project and contract components used to determine invoice amounts and generate invoices.
NEW QUESTION 17
Identify three correct statements about the integration of Primavera P6 Enterprise Project Portfolio Management and Oracle Project Portfolio Management Cloud. (Choose three.)
- A. Billing events flow from Primavera P6 Enterprise Project Portfolio Management to Oracle Project Portfolio Management Cloud.
- B. Summarized actual quantity and cost flow from Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
- C. Event completion flows from Primavera P6 Enterprise Project Portfolio Management to Oracle Project Portfolio Management Cloud.
- D. Project plans and progress flow from Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
- E. Projects and task definitions flow from Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
Answer: B,C,E
Explanation:
Explanation
Ref: https://docs.oracle.com/cd/E48434_01/fusionapps.1118/e49622/F1125394AN6D254.htm Primavera P6 Enterprise Project Portfolio Management and Oracle Fusion Project Portfolio Management:
How They Work TogetherUse Oracle Fusion Project Integration Gateway to integrate Oracle Fusion Project Portfolio Management with Primavera P6 Enterprise Project Portfolio Management. The integration enables project accountants, project billing specialists, and executives to centrally perform project costing, billing, accounting, and executive reporting tasks in Oracle Fusion Project Portfolio Management while enabling each project manager to perform detailed project planning and scheduling in Primavera P6 Enterprise Project Portfolio Management.
Oracle Fusion Project Integration Gateway ensures data security, integrity, and efficiency by defining a set framework in which data is exported from and imported into Oracle Fusion Project Portfolio Management.
The following table and diagram provide an overview of the flow of information.
Information Type
From Application
To Application
Global integration information
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise Project Portfolio Management
Projects and task definition
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise Project Portfolio Management
Summarized project actual quantity and cost
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise Project Portfolio Management
Project plans and progress
Primavera P6 Enterprise Project Portfolio Management
Oracle Fusion Project Portfolio Management
Billing events
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise Project Portfolio Management
Event completion
Primavera P6 Enterprise Project Portfolio Management
Oracle Fusion Project Portfolio Management
NEW QUESTION 18
Your customer wants to assign the Net 45 payment term to all sets except for the corporate business unit specific set, which is assigned the Net 15 payment term. At transaction entry, the list of values for payment terms consists of only one set of data: the set that is assigned to the transaction's business unit.
Which reference data sharing method would you set up to meet the customer requirement? (Choose the best answer.)
- A. assignment to multiple sets; common values allowed
- B. assignment to one set only; no common values allowed
- C. assignment to multiple sets; no common values allowed
- D. assignment to one set only with common values
Answer: C
Explanation:
Explanation
Reference
https://docs.oracle.com/en/cloud/saas/applications-common/19b/facia/define-enterprise-structures.html#FACIA4 Reference Data Sharing Methods Variations exist in the methods used to share data in reference data sets across different types of objects. The following list identifies the methods:
Assignment to one set only, no common values allowed. This method is the simplest form of sharing reference data that allows assigning a reference data object instance to one and only one set. For example, Asset Prorate Conventions are defined and assigned to only one reference data set. This set can be shared across multiple asset books, but all the values are contained only in this one set.
Assignment to one set only, with common values. This method is the most commonly used method of sharing reference data that allows defining reference data object instance across all sets. For example, Receivables Transaction Types are assigned to a common set that is available to all the business units. You need not explicitly assign the transaction types to each business unit. In addition, you can assign a business unit-specific set of transaction types. At transaction entry, the list of values for transaction types includes the following:
Transaction types from the set assigned to the business unit.
Transaction types assigned to the common set that is shared across all business units.
Assignment to multiple sets, no common values allowed. The method of sharing reference data that allows a reference data object instance to be assigned to multiple sets. For instance, Payables Payment Terms use this method. It means that each payment term can be assigned to one or more than one set. For example, you assign the payment term Net 30 to several sets but assign Net 15 to a set specific only to your business unit. At transaction entry, the list of values for payment terms consists of only the set that is assigned to the transaction's business unit.
Note: Oracle Fusion Applications contains a reference data set called Enterprise. Define any reference data that affects your entire enterprise in this set. Also update the data set going forward as you create new reference data items.
NEW QUESTION 19
Your administrator creates maintenance conditions on the Maintain Project Enterprise Labor Resources page.
An HCM person is included in a condition with a process order value of 1 and, additionally, there are three other conditions, all with a process order value of 10. Identify two correct statements about the Maintain Project Enterprise Labor Resources process as it relates to process order values. (Choose two.)
- A. The process creates a resource by using the condition with a process order value of 1 but does not create more than one resource for the same person even if subsequent conditions apply to the person.
- B. For the three conditions that have the same process order value of 10, the records are processed in ascending alphabetic order
- C. The process creates a resource by using the conditions with a process order value of 10 but does not create more than one resource for the same person even if subsequent conditions apply to the person.
- D. For the three conditions that have the same process order value of 10, the records are processed in ascending numeric order based on the condition name.
Answer: A,B
NEW QUESTION 20
Identify the attribute of a project type that determines if expenditure items are billable, and the amount type to be used as the basis for transfer pricing. (Choose the best answer.)
- A. event type
- B. cost type
- C. expenditure type
- D. work type
Answer: D
Explanation:
Explanation
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPFM/OAPFM1125361.htm#OAPFM1125277 (what's a work type?) In billing, you can use work types to classify work for the following purposes:
* To determine the default billable status of expenditure items.
* To classify cross-charge amounts into cost and revenue for cross-charge transactions.
Tip: To use work types to determine whether an expenditure item is billable you must set the profile option Work Type Derived for Expenditure Item to When you create or import expenditure items, the default work type is inherited from the associated task.
Tasks, in turn, inherit work type values from parent tasks and ultimately from the project. Project types determine the default work type value for projects an
NEW QUESTION 21
Identify the valid approval group type applicable to Oracle Project Financial Management Cloud. (Choose the best answer.)
- A. Flexfield
- B. Position
- C. Job
- D. Dynamic
- E. Static
Answer: E
Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/applications-common/19b/facia/define-approval-management.html#FACIA Topic Approval Groups Each approval group includes a set of users that you configure to act on tasks in a certain pattern. Tasks can be defined to get routed to an approval group instead of an individual user. You can nest approval groups within approval groups.
You have two options for defining the group:
* Static: Select the specific users to include in the group.
* Dynamic: Provide the logic to use to determine the users in the group.
NEW QUESTION 22
Your customer accounts revenue based on, product class category. Because all your customer's projects are funded by private and government institutions, they decide to classify all projects based on their funding source to accurately report on revenue in General Ledger. Accordingly, you create a new class category
"Funding Source" and assign it to all projects. However, you notice that the accounting is still happening based on product class category. Identify the reason for this problem. (Choose the best answer.)
- A. Funding source class category is assigned to all project types.
- B. Product class category is not enabled for "available as accounting source".
- C. Funding source class category is enabled for "available as accounting source".
- D. Funding source class category is not enabled for "available as accounting source".
Answer: D
Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-foundation-configuration Topic - Manage Project Class Categories Setting Up Class Categories: Points to Consider Available as Accounting Source This option indicates if the class category is available as an accounting source so that Oracle Fusion Subledger Accounting can use the category to create mapping sets, account rules, journal line rules, and description rules.
Only one class category at a time is available as an accounting source in Oracle Fusion Subledger Accounting.
To change the class category that Oracle Fusion Subledger Accounting uses, deactivate the old class category and create a new one with a different date range.
NEW QUESTION 23
You have a billable project for which the following details are provided:
Associated Inception-To-Date (ITD) Project Actual Cost: USD 60
Associated Project Budgeted Cost: USD 300
Contract Amount: USD 1000
Project Funded Amount: USD 750
Sum of Existing Revenue Events: USD 80
Identify the Associated Project Spent revenue that will get generated based on the preceding details. (Choose the best answer.)
- A. USD 184
- B. USD 134
- C. USD 70
- D. USD 120
Answer: C
Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjb/manage-project-contract-revenue Associated Project Percent Spent Example The following formula calculates the percent spent revenue for the associated project.
((Sum of ITD Actual Cost for every subtask that is part of the associated task / Sum of Total Budgeted cost for every task that is part of associated task) x Associated Project Funded Amount) - Sum of Existing Invoice Event Amounts for the Associated Project ((60/300) x 750) - 80 = 70 ((Actual Cost / Budgeted Cost) x Budgeted Revenue) - Sum of Revenue Event Amount
NEW QUESTION 24
You have four resources in your organization: P, Q, R, and S.
Resource P - Project or resource calendar is active.
Resource Q - Project resource request dates are within the project or resource calendar effective dates.
Resource R - Resource calendar is complex, it does not contain seven days, and it contains more than one pattern and shift.
Resource S - Number of working days within the requested date range is not zero on the project or resource calendar.
Identify the resource for whom Resource Availability Capacity Score will not be calculated. (Choose the best answer.)
- A. Q
- B. S
- C. P
- D. R
Answer: D
Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapem/evaluate-and-assign-resources.h Topic - Resource Available Capacity Score: How It's Calculated Calendars Used to Calculate Resource Available Capacity Scores How the Resource Available Capacity Score Is Calculated
NEW QUESTION 25
Which three setups can be configured by using Rapid Implementation for Project Financial Management Applications?
- A. Project Types
- B. Departments
- C. Project Templates
- D. Expenditure Types
Answer: A,B,D
NEW QUESTION 26
Your customer wants to calculate Estimate to Complete (ETC) as the difference between Current Planned Cost and Actual Cost. In Progress Settings, which option would you use in conjunction with the ETC method to meet this requirement? (Choose the best answer.)
- A. Cost
- B. Manual Entry
- C. Remaining Plan
- D. Effort
Answer: A
Explanation:
Explanation
Reference https://ppm-help.saas.hpe.com/en/9.42/Help/Content/UG/PjMUG/view_pj_cost_data_costtab.htm Below is an example of the Financial Summary view on the Cost tab of the Project Overview page.
https://admhelp.microfocus.com/ppm/en/9.42/Help/Content/UG/PjMUG/images/ProjectOverviewPage_CostTab
NEW QUESTION 27
You search for resources to fulfill a project resource request but are unable to proceed after receiving the following error message: "The search for resources cannot be completed because the project resource search index is not available. Contact your help desk." Identify the cause for this error message. (Choose the best answer.)
- A. The index is in the process of being updated.
- B. The index has been built.
- C. The most recent update of the index finished successfully.
- D. The index is not in the process.
Answer: A
Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/fapfm/implementing-project-execution- Topic - Submitting the Process to Maintain Project Resource Search Index: Procedure Submit the Maintain Project Resource Search Index job set to update the resources that appear on the Search and Evaluate Resources page when a resource manager searches for resources to fulfill project resource requests. The job set consists of a set of processes that facilitate efficient and rapid searches for qualified resources.
Resource managers can't search for resources or view resource details if the search index isn't available for a project resource request with qualifications or keywords. For project resource requests without qualifications and keywords, resource managers can search for and evaluate resources based on resource availability even if the search index isn't current or available.
Caution: The search index isn't available if the Maintain Project Resource Search Index job set process fails, or while the process is running.
NEW QUESTION 28
Your organization performs revenue recognition based on the Labor and Non-labor Burden schedule types.
Identify the setup required to enable this kind of revenue recognition. (Choose the best answer.)
- A. Create a revenue method classification with a revenue method of Percent Spent.
- B. Create a revenue method with a revenue method classification of Amount Based.
- C. Create a revenue method with a revenue method classification of Rate Based.
- D. Create a revenue method classification with a revenue method of Percent Complete.
Answer: C
NEW QUESTION 29
Which two privileges are assigned to the Project Plan Management duty in Security Reference Implementation? (Choose two.)
- A. Allocate Project Expense
- B. Manage Project Plan Resource Assignment
- C. View Project Progress
- D. Transfer Project
Answer: B,C
Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapjm/index.html#_Toc468200732_1_1 Topic - Privileges - This table lists privileges granted to duties of the abstract role Project Management Duty.
Granted Role - Project Plan Management
Privilege - only A and C are listed
NEW QUESTION 30
As part of maintaining (importing new employees that were added last week) project enterprise labor resources in your organization, you submit the Maintain Project Enterprise Labor Resources process to create and update resources based on changes in HCM. You define maintenance conditions on the Manage Project Enterprise Labor Resource page to process both employees and contingent workers. (Choose the best answer.)
- A. Jobs
- B. Person Type
- C. attributes that the project enterprise resources are assigned after creation
- D. Pool Membership
Answer: B
Explanation:
Explanation
Reference https://docs.oracle.com/cloud/farel8/projectcs_gs/OAPEX/F1082603AN23E61.htm Manage Project Enterprise Labor Resource Maintenance Conditions Project Enterprise Labor Resources: How They Are Automatically Created and Maintained Run the Maintain Project Enterprise Labor Resources process to create resources, remove resource availability for staffing, and maintain the resource search index.
Settings That Affect the Maintain Project Enterprise Labor Resources Process Create and maintain project enterprise labor resources by defining a set of conditions that specify the employees and contingent workers in Oracle Fusion Human Capital Management (HCM) to create as resources in Oracle Fusion Project Portfolio Management. Define the resource attribute values, such as the resource calendar and primary project role, to assign to the new resources.
The following table lists the criteria that you define for selecting HCM persons to create as project enterprise labor resources.
Selection Criteria
Description
Person type
Select the HCM person type for the process to use as criteria when selecting HCM persons to create as resources. Available person types are employees, contingent workers, or both employees and contingent workers.
Option to select people based on job
Select this option for the process to create resources for HCM persons with specific jobs.
Caution If you do not select job criteria for this condition, the process will create resources for all eligible people based only on the person type.
Jobs
If you selected the option to select people based on job, then select the jobs for the process to use as HCM person selection criteria.
The following table lists the attributes for which you specify values to assign to resources that are created for the condition.
Resource Attribute
Description
Option to manage resource availability and staffing
Select this option for resource managers to manage the availability and project staffing of resources who are created based on the condition. Resources who are managed in Oracle Fusion Project Resource Management are eligible to fulfill project resource requests.
Calendar
Select the resource calendar for resources that are created based on the condition. The resource calendar defines the work schedule for project enterprise labor resources, and includes working days and hours and any exceptions, such as holidays.
Primary project role
Select the primary project role for resources that are created based on the condition. Project roles are maintained in Oracle Fusion Project Management.
Cost rate and currency
Enter the cost rate and currency for resources that are created based on the condition.
Bill rate and currency
Enter the bill rate and currency for resources that are created based on the condition.
NEW QUESTION 31
......