[Jan 20, 2023] Powerful CTFL_001 PDF Dumps for CTFL_001 Questions [Q196-Q213]

Share

[Jan 20, 2023] Powerful CTFL_001 PDF Dumps for CTFL_001 Questions

Authentic CTFL_001 Dumps - Free PDF Questions to Pass


ISQI CTFL_001 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Certificate will be able to go on to a higher level software testing qualifycation
Topic 2
  • Planning and specification to the conducting and monitoring of tests
Topic 3
  • Who wants a basic understanding of software testing such as project managers

 

NEW QUESTION 196
The purpose of exit criteria is:

  • A. When a set of tests has achieved a specific pre condition
  • B. Define when to stop testing
  • C. All of the above
  • D. End of test level

Answer: C

 

NEW QUESTION 197
Which of the following are valid reasons for adopting a different life cycle (from the V model), for increments after the first year? 2 credits i. We do not have a clear understanding of the requirements from a customer perspective.
ii. We see the risk of delivering requested functionality late as being higher than the risk of delivering a lower quality product.
iii. We do not have a budget for additional regression testing which is needed to ensure that existing functionality is not compromised by future iterations.
iv.
The company test strategy does not fit well within the V life cycle model.

  • A. (ii) and (iii)
  • B. (i) and (ii)
  • C. (i) and (iv)
  • D. (ii) and (iv)

Answer: B

 

NEW QUESTION 198
Which of the following would be the TWO most appropriate examples of entry criteria documented in the system integration test plan?

  • A. The percentage of requirements coverage achieved during system integration test.
  • B. The percentage of acceptance test procedures scheduled for execution.
  • C. The sign-off of a performance test software release note (test item transmittal report) by both development and testing showing that system performance meets the specified acceptance criteria.
  • D. The percentage of decision coverage achieved during unit testing.
  • E. The availability of the latest version of the capture-replay tool (for testing the interface with the newly developed test management tool).

Answer: D,E

Explanation:
Explanation/Reference:
Testlet 1
The project situation after 11 months is:
- The first increment was released one week late but contained sufficient functionality to be declared fit for purpose'. However, there were 20 outstanding incidents deferred to increment two.
- The amount of voluntary overtime worked PV the test team has reduced the second Increment slippage to just 3 weeks.
- There is talk of reducing the scope of requirements. The purpose of this is to first deliver the application with support for manual testing and then to provide a delivery * weeks later to resolve any remaining points and provide support for automated testing (i.e. the link to the capture-replay tool).
- Concerns have been expressed by a section of the user community, that in some places the usability is very poor.

 

NEW QUESTION 199
"Experience based" test design techniques, typically...

  • A. Use the skill, intuition and experience of the tester to derive the test cases, using error guessing and exploratory testing.
  • B. Identify the structure of the system or software at the component, integration or system level.
  • C. Establish traceability from test conditions back to the specifications and requirements.
  • D. Use decision tables to generate the Boolean test conditions to be executed.

Answer: A

 

NEW QUESTION 200
In addition to introducing the new team member, you have decided to raise motivation. Which of the measures listed below would be the best measure to take in order to increase the motivation of the team?

  • A. Provide more time for testing in the schedule
  • B. Organize a meeting with senior management in which they address the importance of good testing for this project
  • C. Introduce entry criteria to the testing phase
  • D. Allow people to take some time off

Answer: B

Explanation:
Explanation/Reference:
Testlet 1
Three exit criteria have been defined for the project:
- A: Test cases passed more than 70%
- B: Number of outstanding defects lest than 5
- C: Number of defects per test case less than 0.5
The first week of the testing has shown the following results:

 

NEW QUESTION 201
Which is not the fundamental test process?

  • A. Analysis and design
  • B. Planning and control
  • C. None
  • D. Test closure activities

Answer: C

 

NEW QUESTION 202
Which of the following is the main purpose of the component build and integration strategy?

  • A. to ensure that the integration testing can be performed by a small team
  • B. to ensure that all of the small components are tested
  • C. to ensure that the system interfaces to other systems and networks
  • D. to specify which components to combine when, and how many at once
  • E. to specify how the software should be divided into components

Answer: D

 

NEW QUESTION 203
Which of the following types of test tool are most likely to include traceability functions?
(i) Performance testing tool
(ii) Requirements management tool
(iii) Configuration management tool
(iv) Static analysis tool

  • A. (i) and (ii)
  • B. (i) and (iv)
  • C. (ii) and (iii)
  • D. (iii) and (iv)

Answer: C

Explanation:
Requirements management tools (ii) have traceability because they enable test conditions and subsequently test scripts and defects to be traced back to requirements. Configuration management tools (iii) also need to trace the appropriate version of a test script to the release or version of a system or module.
Performance monitoring tools (i) and static analysis tools (iv) are designed for specific objectives. Neither of these tools particularly need traceability functions.

 

NEW QUESTION 204
Identify THREE items that would be part of the work-breakdown structure showing the key testing activities for the acceptance test project. 2 credits (for 2 out of 3 correct 1 credit)

  • A. Test planning, test case preparation and test execution for each of the four iterations
  • B. Development activities for unit and integration testing
  • C. Activities to deploy the system in the user environment
  • D. Defining test environment requirements for system testing
  • E. Work should be explicitly allocated to test completion, test management, installation and to training on using the system
  • F. Reviews on requirements documentation
  • G. Regression testing in the second, third and fourth iterations

Answer: A,E,G

 

NEW QUESTION 205
Which one of the following statements about testing techniques is TRUE?

  • A. Exploratory testing can replace black box techniques when testing time is very limited
  • B. Experienced based techniques are systematic and produce detailed test documentation
  • C. Specification based techniques can be used as a substitute for a poorly defined test basis
  • D. Test execution scheduling should give priority to experienced based testing

Answer: A

 

NEW QUESTION 206
The flow graph below shows the logic of a program for which 100% statement coverage and 100% decision coverage is required on exit from component testing. [K4] The following test cases have been run:
Test Case 1 covering path P,Q,R,U
Test Case 2 covering path P,Q,S,V
Test Case 3 covering path P,Q,S,W,X
Test case 4 covering path P,Q,S,W,Y
Refer to the exhibit

  • A. Statement coverage is 100%; decision coverage is 100%
  • B. Statement coverage and decision coverage are both less than 100%
  • C. Statement coverage is 100%; decision coverage is less than 100%
  • D. Statement coverage is less than 100%; decision coverage is 100%.

Answer: B

 

NEW QUESTION 207
A new testing tool has been selected for an organization and a pilot project has successfully completed. The next step is to deploy the tool within the organization.
What is a key success factor in tool deployment?

  • A. Estimate a cost-benefit ratio based on a firm business case
  • B. Assessment of organizational maturity, strengths and weakness
  • C. Provide support for the test team using the tool
  • D. Determine whether benefits will be achieved at reasonable cost

Answer: A

 

NEW QUESTION 208
What is the purpose of a test completion criterion?

  • A. to set the criteria used in generating test inputs
  • B. to ensure that the test case specification is complete
  • C. to know when a specific test has finished its execution
  • D. to determine when to stop testing

Answer: B

 

NEW QUESTION 209
Which of the following would typically be identified using static analysis by tools?

  • A. A variable set to the wrong value
  • B. A potential infinite loop
  • C. Spelling mistake on an error message
  • D. Memory leakage

Answer: B

 

NEW QUESTION 210
Before an invoice can be created, an account is required. Before an account can be set up, an account user is required (in order to set up the account). The software is delivered with a master user only, who can only create other types of users. The following test cases have been written to test the high-level structure of the software
a. Create an invoice
b. Amend an invoice
c. Process an invoice (send to customer)
d. Delete an invoice
e. Create an account
f. Create an account user
g. Amend an account user
h. Delete an account user
i. Amend an account
j. Delete an account
Which of the following test procedures would enable all tests to be run? [K3]

  • A. e, i, a, c, b, d, f, g, h, j
  • B. e, i, f, g, a, c, b, d, h, j
  • C. f, g, e, i, a, b, c, d, j, h
  • D. f, g, a, c, b, d, e, i, j, h

Answer: C

 

NEW QUESTION 211
Which of the following describes structure-based (white-box) test case design techniques?

  • A. Test cases are derived systematically from the delivered code.
  • B. Test cases are derived from the developers' experience.
  • C. Test cases are derived systematically from models of the system.
  • D. Test cases are derived systematically from the tester's experience.

Answer: A

Explanation:
Answer (A) relates to specification-based testing, answer (B) relates to experience-based testing and answer (D) could relate either to debugging or to experience-based techniques.

 

NEW QUESTION 212
A test log is one of the documents that need to be produced in this domain in order to provide evidence of testing. However, the level of detail of test logs can vary. Which of the following is NOT an influencing factor for the level of detail of the test logs being produced?
1 credit

  • A. Test level
  • B. Level of test execution automation
  • C. Experience level of testers
  • D. Regulatory requirements

Answer: C

Explanation:
Topic 1, Scenario 1 "Medical Domain"
You are working as a test manager in the medical domain leading a team of system testers.
You are currently working on a major release of the product which gives customers many new features and resolves a number of problem reports from previous releases.

 

NEW QUESTION 213
......

Guaranteed Accomplishment with Newest Jan-2023 FREE: https://www.testinsides.top/CTFL_001-dumps-review.html