In 2026, questions deserve quick answers. TestInsides's support team replies to instant messages and emails within two hours, whether you ask about the C9510-130 bank before buying or need help with the IBM Rational ClearCase v7.1 materials after.
IBM C9510-130 Exam Overview:
| Certification Vendor: | IBM |
|---|---|
| Exam Name: | IBM Rational ClearCase v7.1 |
| Exam Number: | 000-130 |
| Available Languages: | English |
| Recommended Training: | IBM Training - Rational ClearCase |
| Exam Registration: | IBM Certification Portal |
| Sample Questions: | ![]() |
IBM C9510-130 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| ClearCase Fundamentals | - Version control concepts and ClearCase architecture - Elements, versions, and version trees |
| Administration and Maintenance | - VOB and view administration - Security and permissions |
| Branching and Merging | - Branch creation and management - Merge strategies and conflict resolution |
| Views and Configuration Management | - Config specs and view behavior - Snapshot and dynamic views |
| Integration and Advanced Features | - Performance and troubleshooting basics - Tool integration and environment setup |
| UCM (Unified Change Management) | - Activities and streams - Baseline management |
The C9510-130 Exam and Our Services, Question by Question
IBM recommends the following official training resources:
Choose the format that fits your schedule, then reinforce it with regular question practice.
These are the core domains of the IBM Rational ClearCase v7.1 blueprint:
- Branching and Merging
- Administration and Maintenance
- ClearCase Fundamentals
The remaining domains appear in the full official outline, all of which our bank addresses.
Validity is maintained, not assumed. Our dedicated IT team checks the system and pushes new versions to the site continuously, so the C9510-130 bank on sale is always the latest — with expert-verified answers across the IBM Rational ClearCase v7.1 objectives. You can also pick the format that fits your devices: an easy-to-read PDF, a Windows PC test engine, or a browser-based online engine for Windows, Mac, Android, and iOS. Questions? Support replies to instant messages and emails within two hours.
Upon successful payment, the complete materials are available immediately: a download link on screen and an automatic email to your mailbox within about a minute. If nothing arrives within two hours, check spam and contact support. Every purchase carries a 365-day service warranty — you can download the latest valid version free whenever it is released, no matter when you bought — and a 50% renewal discount follows when the period ends.
Use the official registration channels below:
Pick a center or online appointment that suits your timeline, and book early for the best selection of dates.
Yes, we keep our promises — in writing. If you fail the corresponding exam within 60 days of purchase, email us a scanned copy of your enrollment slip and your official Score Report PDF within two days of the exam date; we process verified refunds in full within seven days. The exclusions are plain: exams taken within three days of purchase, candidate names that do not match the payer, and free or expired products. If you prefer, we will exchange your product for two others of equal value at no charge.
IBM Rational ClearCase v7.1 Sample Questions:
The cleartool mkvob with cmproject option indicates that the administrator is creating what?The cleartool mkvob with ?cmproject option indicates that the administrator is creating what?
- A. UCM project
- B. Component VOB
- C. Project VOB
- D. arootless component
Correct Answer: C 🗳️
How should ClearCase be installed on Linux or UNIX to allow non-root users using the product?
- A. log in as the machine user, and install ClearCase
- B. log in as root, set the umask to 0022 and install
- C. log in as the machine user, set umask to 002 and install
- D. log in as root, set the umask to 002 and install
Correct Answer: B 🗳️
Which two commands are used to write to ClearCase registry file vob_object? (Choose two.)
- A. mkvob
- B. mktag
- C. register
- D. protectvob
Correct Answer: A,C 🗳️
What is step 4 in the process of adding a component to an existing UCM project? 1. select Integration stream , File ->Properties 2. select Configuration Tab -> Add 3. select a component , select a baseline and OK 4.
- A. click OK to rebase stream , Complete & Close
- B. click OK to deliver to stream , Complete & Close
- C. click OK to confirm baseline , Complete & Close
Correct Answer: A 🗳️
What is used to regenerate the view.dat (.view.datin UNIX) file?
- A. regen_view_dot_dat.pl
- B. cleartool mktag command
- C. cleartool register command
- D. regen_view_dot_dat.bat
Correct Answer: A 🗳️




